Product Description
1. This knotless net making machine can produce net, which is used for packing fruit, garlic, flower, industrial products, daily life article.
2. Screw and barrel adopts 38CrMoALA nitriding process with long service life.
3. Drive motor adopts variable frequency control which has high speed control precision, wide adjusting range, low consumption and reliable running.
4. Intelligent digital temperature controller are adopted with high efficiency and low consumption.



Specification
|
Model |
SHWJ-50 |
SHWJ-65 |
SHWJ-80 |
|
Screw diameter |
50mm |
65mm |
80mm |
|
Production Efficiency |
10-12kg/h |
20-30kg/h |
30-40kg/h |
|
Installed power |
25kw |
35kw |
50kw |
|
Machine weight |
1.8T |
2T |
3T |
Details Introduction

| Main motor power | 7.5 kw |
| Mode of main motor control | Frequency control of motor speed |
| Screw material | 38CrMoALA |
| Outside diameter of barrel | Φ105mm |
| Mode of speed change | Extruder dedicated reducer |
| Heating ring | Cast aluminum heater |
| Heating power | 12kw |

| Extruder head | High speed extruder head, frequency control of motor speed |
| Extruder head motor power | 4kw |
| Mode of extruder motor control | Frequency control of motor speed |
| Heating zone of extruder head | 2pcs |
| Heating power | 3kw |

| Sizing method | Size type |
| Cooling method | water cooling |
| Sizing width | according to customer requirement |
| Material of water tank | Stainless steel |

| Temperature control | electric heating water constant temperature control |
| Heating power | 9KW |
| Material of water tank | Stainless steel |
| Size | 2000×230×200mm |
| Tension power | 2.2KW |
| Driving type | Speed Converter |

| Reeling position | double position |
| Driving moment | 10N.M×2 |
| Dehydration power | 0.75KW |
Application


Packing & Delivery

After-sale service
24 hours technical support by email, call, video. 2. Warranty for one year after 12 months of shipment. 3. Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.
Terms of payment
After receiving the deposit 40%, our company will arrange production; 2. After the customer check and accept compression machine, before delivery, customer need to pay off the balance payment.

